Testimonials

Iowa Trenchless has completed numerous trenchless pipe installations

Iowa Trenchless has completed numerous trenchless pipe installations in various soil conditions for our company. They have successfully performed auger boring, rock boring and pipe ramming operations. These have included a 60″ rock bore under Devil’s River in Manitowoc, Wisconsin and a 54″ pipe ram under the East River in DePere, Wisconsin. The East River bore was scheduled to be an auger bore, however, upon excavation of the bore pit, the soils proved to be a wet sandy silt with cobbles. Iowa Trenchless evaluated the conditions and, using their expertise, recommended a revision to pipe ramming. This change was made and the crossing was successfully completed.

Dorner Inc. - Mark Lemens, Construction Coordinator

I wanted to thank Iowa Trenchless for the recent successful bore project

I wanted to thank Iowa Trenchless for the recent successful bore project Iowa Trenchless completed here at Ft. Leavenworth. Rick Siemers and crew Brandon, Chris and Tyler were an outstanding crew. I enjoyed working with your crew. Their commitment to safety and quality product was greatly appreciated by the United States Corps of Engineers, Zieson, and end user DPW/Military. Rick and crew conformed to and exceeded every request made by Lexeco and Zieson. I look forward to working with you guys in the future.

Zieson Construction Co. LLC – Rusty Simon, Superintendent

The Iowa Trenchless team worked hard from the very beginning to make this project a success

The Iowa Trenchless team worked hard from the very beginning to make this project a success. To say the project was a challenge would be an understatement. Boulders the size of a pickup truck, along with utility, railroad and other constraints created challenges that would stump even the most seasoned contractors. Despite that, the management, dedication and expertise of the Iowa Trenchless personnel shined through, meeting every obstacle head-on – literally- and performed exceptionally. The crew from Iowa Trenchless was organized and responsive, working diligently to complete the project.  We were very pleased with the teamwork, cooperation and performance of the Iowa Trenchless team, and would not hesitate to hire them again on the next challenging project.

Hammerlund Construction, Inc. - Thomas E Hammerlund, CEO

Through solid coordination and teamwork

Through solid coordination and teamwork, their personnel identified the inherent challenges for a tunneling project in this location, including the use of multiple trenchless methods, unusually long tunnels, and unexpected geotechnical obstacles. By identifying the challenges early in this job, these contractors were able to collaborate with our team to creatively modify the design, into a complex – but possible – project. Their teamwork, and their staff’s industry experience, helped us to overcome challenges with a proactive, cost-effective approach, and allowed the project to be completed successfully.

Rodriguez Mechanical Contractors, Inc. – Paul Rodriguez, President

The Iowa Trenchless team worked hard from the very beginning to make this project a success

The Iowa Trenchless team worked hard from the very beginning to make this project a success. The contract was expedited, the schedule was fast-tracked, the weather was unforgiving and the project a challenge. Despite that, the management and crew from Iowa Trenchless showed up on­ time, met every obstacle head-on and performed superbly. The crew worked tirelessly – through long hours, weekends and harsh weather conditions – to complete the project.  I was very pleased … would not hesitate to hire them again on the next challenging project.

Lessard Contracting Inc. – Bob Lessard