Call: (641) 755-4692
Missouri Trail Culvert
single page feature image

    Project Details

  • Category:
  • Client: Missouri Trail
  • Location: Missouri
  • Date: March 2019
  • Link:

Missouri Trail Culvert

On This project we had a long narrow trail access that we could not get our big trucks with equipment in so it all had to be brought in on a trailer behind a pickup and 400 had to walk in thru a road tunnel on the way to the jobsite. Plenty of trees and very steep berm along with wet conditions on the bottom made a good challenge.