single page feature image

Iowa City Bike Trail

On this project we had to access thru private property and set up with the river and a high pressure gas main behind us. We drove sheeting on both sides of the gas main to keep our jacking forces off of it and to help hold us as the river was not far behind. The bridge for the trail was already done on the other side and the access for a crane there was limited so we had to lift the machine off the other side of the tracks from the jacking pit side and bring it back over.